The Alumni Center site posed several challenges. The site was intended for use by the Alumni Association was also identified by the City of Morgantown as the potential site for a regional storm water management pond. Alpha was faced with the challenge of integrating the Alumni Center building, parking and amenities with a larger storm water
management pond to control the Popenoe Run drainage basin. This was accomplished by relocating and culverting a portion of Popenoe Run, in coordination with the U.S. Army Corps of Engineers, and creating a two-stage pond.
The upper, smaller pond contains a permanent pool of water and serves as a water feature and focal point for the Alumni Center landscaping, while the lower, larger pond is a dry detention structure which provides most of the storage required during rain events. With this approach, Alpha was able to achieve the goals of both the City of Morgantown and the West Virginia University Alumni Center.
CLIENT
Shepherd University
LOCATION
301 N King St
Shepherdstown, WV 25443
SIZE
Tunnel - 28' x 56'
Roadway - 1,050 FT
Retaining Wall - 900 FT
COMPLETION
2012
COST
$4 Million
"The $5.65 million project, which commenced in January of last year (2013) with relocation of utilities, was aimed at eliminating pedestrian crossings and constructed 25 yards northeast of the previously existing pedestrian crosswalk. Our team of expert mechanical engineers can provide solutions for your mechanical design, analysis, and testing needs. From concept to production, we work with you to ensure your project is delivered on time and within budget."
Suzan Shipley, Ph. D, Former University President